Advantages:

1. Only panels and props for convenient and simple connection.

2. Birch plywood, replaceable

3. Quick work operation

4. Light weight, convenient disassembly

5. Safer: good stability, high carrying capacity

6. Concrete molding quality is good, long service life

7. Faster: More efficient, saves time and money.

8. Standardized panels for various structural buildings

9. Handheld design: Maximum size panel 1800 × 1800mm


Share:

Rizhao Fenghua Aluminum Deck Formwork

FW00D


For High-Rise Construction Efficiency  

As China's premier formwork manufacturer since 1953, RFH has developed precision-engineered solutions tailored for the demands of modern high-rise construction.  


The Aluminum Deck Formwork integrates aerospace-grade 6005-T6 aluminum alloy frames with 11 mm Baltic birch plywood panels,  

bonded using phenol-formaldehyde resin to ensure exceptional structural integrity and long-term durability.  


Certified Performance: Compliant with European Standards. it can be used together with topec.

Aluminium Alloy Formwork

Applications:

Widely used for flat slab or beam-less concrete project

Aluminium Alloy Formwork

Specification:

Standard:

European Standard

Sizes:

1800X1800mm  1800X900mm  1800X750mm  

Other clients sizes are available.

Thinkness:140mm

Surface treatment: Alluminium Alloy

sizes.png

aluminium formwork.png

Adjustable aluminium formwork.png

Packing and shipment:

Aluminium Slab Topec Formwork

Aluminium Slab Topec Formwork


Factory show:


why us.png


Aluminum Deck Formwork

When we talk with contractors about floor construction, one question comes up again and again:  how can the formwork be strong enough for concrete work but still easy for workers to handle?  Our answer is Aluminum Deck Formwork. We developed this type of formwork for  concrete slab and floor construction where repeated use, simple handling, flexible installation,  and steady construction quality are important.

At Rizhao Fenghua Scaffolding Co., Ltd., we have been making construction formwork and scaffolding  products since 1953. We manufacture Aluminum Alloy Formwork, Steel Formwork, adjustable supports,  ring lock scaffolding, Cuplock Scaffolding, Frame Scaffolding, and construction accessories at our  factory in Rizhao, Shandong, China. Our factory covers approximately 80,000 m² and includes  professional production workshops, advanced manufacturing equipment, and automated welding lines.

We do not treat aluminum deck formwork as just a collection of panels. In real construction, the  panel is only one part of the system. The support arrangement, panel layout, connections, floor  dimensions, concrete conditions, worker experience, and project schedule all affect how well the  system performs. That is why we prefer to discuss the complete project before confirming a final  formwork configuration.

Our Aluminum Deck Formwork can be customized according to customer drawings and  project requirements. It is suitable for residential buildings, commercial buildings, hotels,  infrastructure projects, industrial plants, and other concrete construction applications where  an organized and reusable floor formwork solution is needed.

1. What Is Aluminum Deck Formwork?

Aluminum Deck Formwork is a temporary forming system used to create concrete floor slabs and other  horizontal concrete structures. The basic job is simple: the formwork creates the shape of the  concrete while the supporting structure holds the formwork in position during concrete placement.  After the concrete reaches the required condition for stripping, the panels and supports are removed  according to the approved construction procedure and prepared for another cycle.

We use aluminum because it offers a useful combination of relatively low handling weight, strength,  corrosion resistance, and repeat-use potential. Compared with many traditional site-built timber  solutions, a modular aluminum deck system can give workers a more organized way to build repeated  floor sections.

The word deck in this product name refers to the horizontal forming surface used  for floor or slab construction. Depending on the project design, an aluminum deck Formwork System  can work with supporting components such as props, beams, frames, or other temporary support  structures.

We normally start with the project drawings instead of starting with a fixed panel list. A floor  may contain standard areas together with beams, columns, wall edges, openings, balconies, shafts,  or changes in slab dimensions. We review these areas and determine where standard panels can be  used and where customized components may be required.

This approach is especially helpful for repetitive buildings. Imagine a residential project with  twenty floors and similar floor layouts. Once the panel arrangement has been properly planned,  the construction team does not need to create a completely new formwork solution for every floor.  The same basic process can be repeated, with adjustments made where the building design changes.

It is also important to understand what aluminum deck formwork does not do. It does not replace  structural engineering, temporary works design, site supervision, or construction safety procedures.  The final support spacing, allowable loads, stripping time, and concrete placement method must be  confirmed for the specific project by qualified personnel.

Aluminum Deck Formwork vs. Traditional Site-Built Formwork

We often explain the difference to customers in practical terms. Traditional timber formwork gives  workers a lot of freedom to cut and adjust materials directly on site. That can be useful when every  part of a building is different. The downside is that repeated cutting, measuring, fixing, and  rebuilding can take more time and create more material waste.

An Aluminum Deck Formwork System takes the opposite approach. More work is done before the panels  arrive at the construction site. Dimensions and panel layouts are planned in advance, and the site  team follows a repeatable installation process.

General Comparison of Common Floor Formwork Approaches
FactorTraditional Timber FormworkSteel FormworkAluminum Deck Formwork
On-site cuttingCommonly requiredLimitedNormally minimized through prior planning
Panel handlingDepends on timber sizeGenerally heavierRelatively convenient for properly designed panels
Repeat usePossible but material condition variesGoodDesigned for repeated construction cycles
Layout planningFlexible on siteUsually plannedStrongly based on modular planning
Best project fitIrregular or smaller projectsHeavy-duty reusable applicationsRepetitive slab and floor construction

Source: Rizhao Fenghua Scaffolding Co., Ltd. internal product application guidance  and manufacturing experience. This table provides a general selection reference rather than a  guaranteed performance comparison. Actual results depend on project design, material specifications,  installation methods, and site conditions.

2. How Does an Aluminum Deck Formwork System Work?

The working principle of our Aluminum Deck Formwork System is easy to understand.  First, the supporting structure is installed. The aluminum panels are then positioned on the support  system to create a continuous forming surface. Once everything has been checked, concrete is placed  on the prepared deck.

The formwork temporarily carries the weight and pressure associated with the concrete placement  process through the designed support system. The exact load capacity and support arrangement are not  something we guess from a standard catalog. They must be checked against the project's structural  and temporary works requirements.

Step 1: Review the Drawings

We begin by studying the customer's architectural and structural drawings. We look at floor  dimensions, slab thickness, beams, columns, wall locations, openings, stair areas, shafts,  balconies, and other details that may affect the panel layout.

This first step sounds basic, but it saves problems later. If a panel is designed without considering  an opening or a change in floor geometry, workers may need to modify it on site. We prefer to solve  these issues during the design stage.

Step 2: Create the Panel Layout

After reviewing the drawings, we determine the arrangement of standard and customized deck panels.  The objective is to make the layout logical and easy to follow. A good layout reduces unnecessary  adjustments and helps workers understand where each panel belongs.

Step 3: Install the Supports

The support structure is installed according to the approved temporary works design. Depending on  the project, different supporting components may be used. We can also supply adjustable supports  and other scaffolding products as part of our broader construction equipment range.

Step 4: Install the Aluminum Panels

The aluminum deck panels are placed on the prepared supports and connected according to the planned  configuration. Workers check the level, alignment, joints, edges, openings, and other important  details before concrete placement.

Step 5: Concrete Placement

Concrete is poured according to the project's approved construction method. Workers should control  the concrete placement sequence and avoid actions that could create unexpected loads or movement.  The formwork must remain stable throughout this stage.

Step 6: Stripping and Reuse

Once the concrete has reached the required condition specified by the project engineer, the  formwork can be stripped following the approved procedure. Panels are removed carefully, cleaned,  inspected, and moved to the next work area.

This cycle is what makes a reusable aluminum deck formwork system attractive for repeated floor  construction. The system is not designed to be thrown away after one pour. Proper handling and  maintenance are important if the customer wants to get good value from repeated use.

  1. Review architectural and structural drawings.

  2. Develop the aluminum deck panel layout.

  3. Confirm the support and temporary works arrangement.

  4. Install supports and horizontal members.

  5. Position and connect aluminum deck panels.

  6. Check level, alignment, joints, edges, and openings.

  7. Place concrete according to the approved construction method.

  8. Strip, clean, inspect, and prepare panels for reuse.

3. Main Features of Our Aluminum Deck Formwork


When we design an aluminum deck formwork system for concrete slabs, we focus on  practical site use rather than adding features that look good only in a brochure. Construction  workers need equipment that makes sense when they are standing on a busy floor with materials,  tools, concrete, and other trades working nearby.

Lightweight and Easier to Handle

Aluminum is lighter than many steel alternatives. This can make individual panels more convenient  to move and position, depending on their final size and configuration. Easier handling can be  useful when panels are repeatedly moved from one floor to another.

We still pay attention to panel size. Making a panel extremely large may reduce the number of  pieces but can make manual handling difficult. We therefore consider panel dimensions together with  worker access, building layout, lifting arrangements, and project construction methods.

Reusable Design

A major reason to select aluminum deck formwork is repeat use. Instead of buying materials for one  concrete pour and disposing of them afterward, a properly maintained system can be moved through  multiple construction cycles.

The actual service life depends on many factors, including alloy and profile selection, panel design,  stripping method, storage, cleaning, impact damage, and site management. For this reason, we avoid  promising one universal reuse number for every project.

Modular Construction

Modular panels make it easier to organize the forming surface. Standard panels can cover regular  floor areas, while customized panels can address special sections. This combination gives contractors  a balance between repeatability and flexibility.

Customized Dimensions

Every construction project has its own details. We can manufacture aluminum formwork according to  customer drawings, including different panel dimensions and special components where required.  Customized manufacturing is particularly useful when the building has repeated but non-standard  floor layouts.

Stable Forming Surface

A properly assembled aluminum deck provides a consistent surface for concrete slab construction.  Good panel alignment and careful joint management help create a more controlled forming process.  The final concrete result, however, also depends on concrete quality, vibration, placement,  stripping, curing, and workmanship.

Easy Identification and Organization

On a large construction site, organization matters more than people sometimes expect. A formwork  system with clearly planned components can make it easier for workers to identify the correct panel  and return components to their proper locations.

Suitable for Repetitive Buildings

We see strong demand for aluminum floor formwork in apartment buildings, hotels, residential towers,  commercial buildings, and other projects with repeated slab layouts. Once the first cycle is  completed and the workers become familiar with the system, subsequent floors can follow the same  basic sequence.

Key Aluminum Deck Formwork Features and Practical Benefits
FeaturePractical BenefitWhat We Recommend
Aluminum constructionConvenient handling and reusable design potentialSelect panel dimensions according to the project
Modular panelsMore organized installationPrepare the panel layout before production
Reusable componentsUseful for repeated floor cyclesClean and inspect panels after each use
Custom productionBetter fit for project-specific layoutsProvide complete structural and architectural drawings
Integrated supportAllows coordinated temporary works planningFollow the approved support design and load requirements

Source: Rizhao Fenghua product design and manufacturing guidance. The benefits  listed are practical application observations and should not be interpreted as guaranteed engineering  performance for every project.

4. Technical Advantages for Real Construction Sites

We have learned over many years that construction equipment has to work in the real world. A product  can look excellent in a factory photograph, but that is not enough. Workers need to move it, install  it, remove it, clean it, and use it again.

Faster Repetitive Installation

When floor layouts are repeated, the same panel sequence can be used again. Workers do not have to  rethink the entire forming process on every level. This repeatability can help contractors organize  manpower and construction schedules more effectively.

We deliberately use the word “can” here. Formwork does not automatically make a project  faster. Productivity depends on crew experience, site access, crane or material-handling arrangements,  concrete scheduling, floor geometry, weather, and many other factors.

Lower Material Waste Compared with Repeated Cutting

With a modular aluminum system, many dimensions are decided before production. This can reduce the  need for repeated cutting and temporary fabrication on site. It does not mean that every project  will have zero waste, but the construction process can become more controlled.

Better Workflow Planning

A planned deck formwork layout allows the construction team to think ahead. They can prepare panels,  supports, lifting routes, storage areas, and labor requirements before the next floor begins.

Consistent Panel Arrangement

Repeated panel positioning helps create a consistent work routine. Once workers know the panel  sequence, training and supervision can become easier, especially on large projects with many  repeated floor cycles.

Good Fit for Factory-Based Production

Because the panels are manufactured before they reach the job site, quality checks can be carried  out in a controlled production environment. Dimensions, assembly details, welding where applicable,  surface condition, and other manufacturing points can be inspected before shipment.

International Project Adaptability

We export construction products to customers in many markets. Different countries may have different  construction practices, standards, documentation requirements, and packaging expectations. We  therefore confirm these requirements with customers before production instead of assuming that one  configuration will fit every market.

Our products are inspected under our ISO9001 quality management system. Depending on the product  category and applicable requirements, our manufacturing and product portfolio also covers standards  and certifications including EN74, EN1090, and CE.

These standards should be understood correctly. A certification or standard does not mean that every  product has the same specification. The applicable standard depends on the product, intended use,  market, and conformity requirements. We confirm the relevant requirements for each order.

What Really Affects Formwork Productivity?

Common Factors Affecting Floor Formwork Productivity
FactorPositive ConditionPotential Challenge
Floor repetitionMany similar floorsFew repeated layouts
Panel planningComplete drawings confirmed before productionFrequent design changes
Worker experienceTeam familiar with modular formworkLimited system experience
Material movementClear lifting and transfer planRestricted site access
MaintenanceRegular cleaning and inspectionRough stripping or poor storage
Project coordinationFormwork integrated into construction scheduleUnplanned changes and site delays

Source: Rizhao Fenghua project planning experience and product application guidance.  This is a practical planning table, not a statistical productivity study. Actual construction output  should be measured according to the specific project.

5. Where Can Aluminum Deck Formwork Be Used?

We supply aluminum deck formwork for a wide range of concrete construction applications. The strongest  fit is usually a project where the floor or slab layout is repeated and where the contractor wants  a reusable forming system rather than building the entire system from scratch on every floor.

Residential Buildings

Residential construction is one of the most natural applications for aluminum deck formwork  for concrete slabs. Apartment buildings often have repeated rooms, corridors, structural  walls, and floor layouts. A planned modular system can help the site team repeat the same construction  process across multiple levels.

High-Rise Buildings

High-rise residential and commercial buildings may contain many repeated floors. This makes reusable  aluminum floor formwork an attractive option when the building geometry is suitable.

High-rise projects also require careful planning. Material movement, edge protection, working platforms,  lifting equipment, temporary supports, wind conditions, and site access all need to be considered.  We therefore recommend that the formwork system is included in the overall temporary works and  construction plan from the beginning.

Hotels

Hotel projects often contain repeated guest-room floors. When room dimensions and structural layouts  are similar, aluminum deck panels can be organized into a repeatable floor cycle.

Commercial Buildings


Offices, shopping centers, mixed-use buildings, and other commercial projects may also use aluminum  deck formwork for concrete floors. The suitability depends on slab geometry, construction method,  project schedule, and engineering requirements.

Industrial Plants

Industrial buildings may include concrete floors, platforms, equipment areas, and structural slabs.  Aluminum formwork can be considered where the forming geometry and construction sequence are compatible  with modular panel use.

Infrastructure Projects

We also serve infrastructure and civil construction markets. However, bridges and other infrastructure  structures can have very different shapes and loads. In these cases, we recommend a project-specific  engineering review before selecting the final formwork arrangement.

Projects With Repeated Concrete Floors

This is perhaps the most important application category. If the same floor design is built many times,  a reusable aluminum deck formwork system has more opportunity to show its value. If every floor is  completely different, a highly modular system may not provide the same benefit.

We always ask customers about the number of floors, floor repetition, slab thickness, floor dimensions,  project schedule, and construction method before recommending a solution. That simple discussion can  prevent an expensive mismatch between the product and the project.

6. How We Manufacture Aluminum Deck Formwork

Manufacturing quality starts before production. For a customized Aluminum Deck Formwork  System, we first need accurate project information. The customer's drawings and specifications  determine the panel dimensions, quantities, special components, and production requirements.

Drawing and Requirement Review

Our technical team reviews the drawings to understand the actual floor arrangement. We look for  repeated areas, special areas, openings, beam positions, edge conditions, and other features that  affect the formwork layout.

We also confirm commercial requirements such as order quantity, packaging method, delivery location,  required documents, and expected production schedule.

Material Preparation

Aluminum materials and related components are prepared according to the approved production  requirements. Material dimensions and specifications are controlled during the manufacturing process.

Cutting and Machining

Aluminum profiles and components are processed according to the production drawings. Accurate cutting  is important because small dimensional errors can become noticeable when many panels are connected  together.

Welding and Component Assembly

Where welding is part of the product design, controlled welding procedures are followed. Our factory  also has automated welding lines and extensive experience manufacturing steel formwork and scaffolding  products.

Dimensional Inspection

Finished panels are checked against production requirements. Depending on the product configuration,  inspection can include dimensions, connection details, visual condition, weld quality where applicable,  assembly condition, and component identification.

Surface and Final Inspection

We check the finished products before packing. The goal is not simply to find obvious defects. We also  want to make sure the shipment matches the customer's approved order and that the components are  properly prepared for transportation.

Export Packing

Formwork components are packed according to their size, quantity, transportation method, and customer  requirements. Steel frames, bundles, and export-standard packaging can be used where appropriate.

Proper packaging is particularly important for international orders. Components may be loaded,  unloaded, stored, and transported several times before reaching the construction site. We therefore  pay attention to both protection and convenient identification.

Typical Production Flow

  1. Customer submits drawings and project requirements.

  2. Our team reviews dimensions and application conditions.

  3. Panel layout and production requirements are confirmed.

  4. Materials and components are prepared.

  5. Cutting, machining, welding, and assembly are completed.

  6. Finished components are inspected.

  7. Products are packed according to the shipping plan.

  8. Goods are shipped by sea, rail, or other suitable logistics methods.

Our standard production lead time is usually 30–60 days. The actual schedule depends  on order quantity, customization requirements, drawing confirmation, production capacity, inspection,  and packaging requirements. We confirm the specific delivery schedule before production begins.

7. Why Choose Rizhao Fenghua for Aluminum Deck Formwork?

We know there are many formwork suppliers in the market. So why should a contractor or distributor  choose us? The answer is not one single number. It is our manufacturing background, product range,  customization capability, quality management, and experience with international customers.

More Than 70 Years of Manufacturing History

Rizhao Fenghua Scaffolding Co., Ltd. was established in 1953. That gives us a long history in the  construction equipment field. Over the years, our product range has expanded from traditional  construction equipment into aluminum alloy formwork, steel formwork, Scaffolding Systems,  adjustable supports, and customized construction solutions.

80,000 m² Manufacturing Facility

Our factory in Rizhao, Shandong, covers approximately 80,000 m². The facility includes professional  workshops, production equipment, automated welding lines, storage areas, and inspection capabilities.  A large manufacturing base gives us the space to manage production and larger international orders  in a more organized way.

Customized According to Drawings

This is one of our strongest advantages. We understand that a real construction project cannot always  use a completely standard catalog product. Floor dimensions, slab thickness, beams, openings, columns,  and wall arrangements can all vary.

We can work with customer drawings to develop the required aluminum deck formwork configuration.  This makes our solution suitable for contractors who need project-specific panels rather than generic  stock products.

Wide Construction Equipment Range

We manufacture more than aluminum formwork. Our range includes steel formwork, adjustable supports,  ring lock scaffolding, cuplock scaffolding, frame scaffolding, and construction accessories.  Customers who need several types of construction equipment can therefore communicate with one  manufacturing partner.

Quality Management

Our manufacturing process operates under ISO9001 quality management. Depending on the product and  applicable market requirements, we also work with standards and certifications including EN74,  EN1090, and CE.

We believe quality control should be part of production rather than something added at the end.  Material preparation, processing, welding where applicable, assembly, inspection, and packing all  form part of the manufacturing process.

International Export Experience

Our products have been exported to 126 countries and regions. International orders  require more than manufacturing. Customers also need clear documentation, suitable packaging,  production communication, payment arrangements, and shipping coordination.

We support flexible payment terms including T/T and L/C. Products can be shipped by sea, rail,  or other international logistics methods according to the order and destination.

Rizhao Fenghua Supply and Manufacturing Profile
ItemOur InformationWhy It Matters to Buyers
Established1953Long-term manufacturing experience
Factory areaApproximately 80,000 m²Supports organized production and storage
Product categoriesFormwork, scaffolding and construction accessoriesBroader sourcing capability
Export markets126 countries and regionsExperience with international supply
CustomizationAvailable according to drawings and project requirementsSuitable for project-specific applications
Typical lead time30–60 daysAllows buyers to plan project procurement

Source: Rizhao Fenghua Scaffolding Co., Ltd. company information and product  manufacturing records supplied for this product page. Lead time is a typical range and must be  confirmed for each order.

8. Aluminum Deck Formwork FAQ

What is Aluminum Deck Formwork used for?

Aluminum Deck Formwork is mainly used to create concrete floor slabs and horizontal structural  elements. It is particularly suitable for residential, commercial, hotel, and other projects with  repeated floor layouts.

What is the main advantage of aluminum deck formwork?

The main advantage is the combination of relatively convenient handling, modular construction,  repeat use, and project customization. For repetitive floor construction, these features can help  create a more organized workflow.

Is aluminum deck formwork better than timber formwork?

It depends on the project. Aluminum deck formwork can be a strong choice for repeated floor layouts,  while timber can be more flexible for irregular or small projects. We recommend comparing project  repetition, labor, schedule, geometry, material movement, and expected reuse before making a decision.

Can you customize Aluminum Deck Formwork?

Yes. We can manufacture aluminum deck panels and related components according to customer drawings  and project requirements. Customized production can cover different panel dimensions and special  areas of the floor layout.

Can Aluminum Deck Formwork be reused?

Yes. The system is designed for repeated construction use when properly handled and maintained.  However, the actual number of practical reuse cycles depends on material, panel design, stripping  method, cleaning, storage, impact, and site conditions.

Is aluminum deck formwork suitable for high-rise buildings?

It can be suitable when the building has repeated floor layouts and the formwork system is properly  engineered for the project. High-rise projects require additional planning for temporary works,  lifting, edge protection, access, wind, and material movement.

What drawings do you need for a quotation?

We recommend providing architectural floor plans, structural drawings, slab thickness, beam and  column dimensions, floor quantity, project location, special requirements, expected order quantity,  and desired delivery schedule. Complete information helps us prepare a more accurate solution.

How long does production take?

Our normal production lead time is around 30–60 days. The actual lead time depends on the order  quantity, customization, drawing confirmation, inspection, production schedule, and packaging  requirements.

How do you package aluminum deck formwork?

We select the packaging method according to the product configuration and transportation requirements.  Steel frames, bundles, and export-standard packaging can be used where appropriate. The final packing  plan is confirmed with the customer before shipment.

What payment methods do you accept?

We support international payment methods including T/T and L/C. The exact payment terms are agreed  in the commercial contract according to the order requirements.

Can you supply scaffolding together with aluminum formwork?

Yes. Our product range includes ring lock scaffolding, cuplock scaffolding, frame scaffolding,  adjustable supports, steel formwork, aluminum alloy formwork, and construction accessories. This  allows us to support customers who need several construction equipment categories.

How should the final formwork system be approved?

The final formwork arrangement should be reviewed and approved according to the project's structural  design, temporary works requirements, local regulations, construction method, and qualified engineering  procedures. Our product information is intended to support procurement and technical discussions,  not replace project-specific engineering approval.

Conclusion: A Practical Reusable Solution for Concrete Floor Construction

We manufacture Aluminum Deck Formwork for customers who want a practical and reusable  solution for concrete floor and slab construction. Our focus is not simply on producing aluminum  panels. We look at the complete process, from drawing review and panel planning to manufacturing,  inspection, packaging, and international delivery.

For repetitive residential buildings, hotels, commercial projects, and other construction applications,  a modular aluminum deck formwork system can make the work more organized. Workers can follow a planned  panel arrangement, reuse components on later floors, and reduce the need for repeated site fabrication.

At the same time, we believe buyers should select formwork based on real project conditions. There is  no single formwork system that is perfect for every building. Floor repetition, slab dimensions,  support requirements, labor conditions, construction schedule, material handling, and local safety  rules all need to be considered.

With a manufacturing history dating back to 1953, an approximately 80,000 m² factory, international  export experience covering 126 countries and regions, ISO9001 quality management, and customized  manufacturing capabilities, we are prepared to work with contractors, developers, distributors,  Formwork Companies, and construction equipment buyers worldwide.

If you are looking for an aluminum deck formwork manufacturer, a  reusable aluminum deck formwork system, aluminum slab formwork,  or customized aluminum formwork for concrete floor construction, send us your  project drawings and basic requirements. We can review the application, discuss the panel layout,  confirm production details, and provide a practical solution based on your actual construction needs.

Rizhao Fenghua Scaffolding Co., Ltd. — We manufacture formwork and scaffolding  products with a focus on practical design, controlled production, customized solutions, and reliable  international supply.

Product Information at a Glance

  • Product: Aluminum Deck Formwork

  • Product Type: Aluminum floor and slab formwork system

  • Main Application: Concrete floor and slab construction

  • Typical Projects: Residential, commercial, hotel, high-rise, industrial and infrastructure projects

  • Material: Aluminum alloy components according to product design

  • Customization: Available according to customer drawings and project requirements

  • Manufacturer: Rizhao Fenghua Scaffolding Co., Ltd.

  • Factory Location: Rizhao, Shandong, China

  • Factory Area: Approximately 80,000 m²

  • Quality Management: ISO9001

  • Relevant Standards and Certifications: EN74, EN1090 and CE, where applicable

  • Typical Production Lead Time: 30–60 days, subject to order and customization

  • Payment Terms: T/T and L/C

  • Packaging: Steel frames, bundles, or export-standard packaging according to requirements

  • Shipping: Sea, rail, and other international logistics methods

Advantages:

1. Only panels and props for convenient and simple connection.

2. Birch plywood, replaceable

3. Quick work operation

4. Light weight, convenient disassembly

5. Safer: good stability, high carrying capacity

6. Concrete molding quality is good, long service life

7. Faster: More efficient, saves time and money.

8. Standardized panels for various structural buildings

9. Handheld design: Maximum size panel 1800 × 1800mm


Leave your messages
    Please fill in a valid email address
    Captcha Can not be empty
Related Products
Popular supply
  • Heavy Duty Steel Formwork Shutter
    Heavy Duty Steel Formwork Shutter
  • Concrete Formwork For Wall and Column
    Concrete Formwork For Wall and Column
  • Heavy Duty Steel Wall Formwork
    Heavy Duty Steel Wall Formwork
  • Copyright © 2020-2025 Rizhao Fenghua Scaffoldings Co.,Ltd.  Powered by:baiqinggeo

      sitemap

    This website uses cookies to ensure you get the best experience on our website.